The Swiss server has been successfully upgraded to a quad-core Xeon E5620 and is responding well to the load. The upgrade took about 20 minutes in total resulting in a very brief downtime.
On the 30th Sept, the schedule remains and the Swiss server will again be migrated to a high bandwidth pipe which should once again improve performance.
Thank you for your kind understanding.

0 
